Saturday, June 30, 2012

Transmission Enginear



Muhammad
 


Nationality:                        Pakistani
Lingustic Skills:                 English,Arabic,Urdu ( Fluently )
Status:                                  Single
E-mail:                                  mohammaduzaif@gmail.com
Cell:                                       +966 54 6271 483

CAREER OBJECTIVE.


To be  comptent  as  a  technical  professional  that can contribute towards a better means of communication. To improve current skills and  knowledge through sharing the best practices in telecommunication industry. My greatest  strength  is  my ability to walk into a new environment and be functional immediately. I am quick to learn and adapt to new situations, configurations and technologies.

PROFILE.


Talented Communication Engineer with GSM and Transmission  communication training. Having  more than 3 year's managed and responsible Telecommunication experience. Expertise includes GSM Hardware troubleshooting, installing new networks. Exceptional communication and interpersonal skills. Good  in depth knowledge of windows,Ms office and  Internet Browser.  Available for relocation and travel.

EDUCATION.


  • F.SC Pre Engineering
  • Bachelor of Computer Science ( B.SC )
  • DIT (Diploma  Information Technology) One Year
  • DIC (Diploma Information Communication) One Year

KEY SKILLS.


·         Integaration and  Commissioning GSM and Transmmision.
·         Maintenance and troubleshooting GSM and Transmission event.
·         Site master of GSM sites.
·         LOS (Line  of  Site Survey).
·         Details of call phases & troubleshooting.

Work Experience in Communication.


More than Three years experience in Communication field as a System/TRM Engineer.



Mobily Project

 Melc , Saudia Arabia .                                                                                                     Position: Transmission Implementation Engineer
Department : Implementation
Duration: Jan  2011 – May 2012

§  Installation, commissioning and fault testing of MINILINK Traffic Nodes (2P, 2Pb, 6PB, 6PC,6PD, 20P, 20Pb).SDH and PDH nodes.
§  Configuring& Replacing Cards like MMU, NPU, LTU (e/o), TRU (e/o), and SMU in the AMM while troubleshooting.
§  Down/Upload the Backup files to or from NPU through BFTP Server.
§  Traffic Routing from BSC till end site.
§  Performing BER Test for E1 Performance.
§  Upgrade Baseline software.
§  DCN configuration to ensure visibility on NE in Minilink Manager.
§  Perform Troubleshooting/Operation and Maintenance for HC Links.
§  SW Upgrade of TN at PDH Nodes (From SW Baseline R11E10 to R15A23/R20A34) in order to remove the SW/HW Compatibility Issues of different plug in units.
§  Conduct MDT for Hardware Upgradation (Capacity, frequency, traffic Cut over).
§  Configuring& Replacing Cards like MMU, TRU (e/o) & TRU (e) for HC (1+1 & 1+0).
§  Software Upgrading for HC using TFTP & Configuring HC links
§  Microwave Link Transfer/shifting the traffic from one link to another due to LOS(line of sight) issues
§  Software Upgrading for Hi-Cap using TFTP & Configuring Hi-Cap links along with its Troubleshooting
§  Down/Upload the Backup files to or from HC through TFTP Server
§  Experience in doing MDT for links Upgrade.
§  Realignment of the Link to improve RSL.
§  Swapping the NPU8x2, NPU 1B, NPU2, NPU3, NPU3B, NPU1C as per the Requirements.
§  Installation and Commissioning of TN R4, MMU 2D, MMU 2E, NPU 1C, NPU 3B, ETU 2, ETU 2B.
§  Installation and Commissioning of OMS(1410) and Troubleshooting all types of alarms, Creating VLAN ID’s in Fiber (Nodes AMM 6P D) and OMS, Performing Ping test from Node B to RNC.
§  Creating Cross Connection (Traffic Routing) in OMS, Taking Backup.
§  Installing SFP’s in OMS and defining ports accordingly.
§  Creating IMA groups and Bridge Configuration in ETU 2 and ETU 2B, in AMM 6PD.
§  Configuring Fast Ethernet circuit to 3G sites.
§  Perform MDT to transfer the 3G TDM traffic to fast Ethernet.
§  Responsible for Complete Acceptance of the site & coordinate with the Sub-con to rectify all alarms before final Acceptance.
§  Prepare acceptance checklist on newly installed sites and performed PAT.
§  Clearing the pat for both MW and BSS.
§  Clearing the VSWR alarms if needed.
§  Handling the issues of BSS.
§  Changing the CTU, surf, Controller, Duplexer things when having alarms in BTS .
§  Preparing daily report and monthly report submit on time to Team Leader.               





Field  Maintenance Training  NO&M in Saudi Arabia.(Network Operation and Maintenance)


Part of  NO & M team, responsibale for field Maintenance of a GSM 900/1800  Network . Work  carried  out  involving  maintenance  of  the  RBS  2206,2206 V2, 2216, 2216 V2 and  Ericsson Mini_Link.

      (NOV 2009-MAY ,2010)                                                         

I did work in Novia Com as  a Fallowing duties:                                                     
     
  • Transmission Engineer
  • Tester

Ericsson Project:


  • Lead in the Installation of Telecom works (RBS and Traffic Node Radio) both for Indoor (RBS cabinet, DF, TRM rack, Rectifier cabinet, AMM magazine (Indoor unit), Laying and termination of cables) and Outdoor (Antenna, ddTMA, Feeder and Jumpers, Grounding, Feeder Entry Plate (Roxtec) as a subcontractor to Ericsson for Etihad Etisalat L+1 and L+5Project.
  • Lead in the Installation of Transmission works (Traffic Node Radio) both for Indoor (TRM rack, AMM magazine (indoor unit), DC Power and Termination of cables) and Outdoor (MW Antenna, Outdoor unit, IF cables) as a subcontractor to Motorola for  Etihad Etisalat Upgrade  L+1 and L+2 Project.
  • Performed Commissioning, Testing and Integration of Ericsson RBS 2206 cabinets.
  • Performed Upgrade, Installation, Testing and Commissioning of Minilink TN (Traffic Node) for 2P, 6P, 20 P and HC STM-1 to Motorola for Etihad Etisalat Project.
  • Configuration on IDB for IXU, RRU in Master and Extension.
  • Performed Upgrade and Expansion on existing RBS 2206.
  • Loading Installation Data Base (IDB), TEI settings, PCM mode to the DXU using OMT software during commissioning.
  • Installation of TMA-CM, DC Bias injector inside the RBS 2206,RBS2206 V2, cabinet and performed configuration of IDB.
  • Simulate alarms at site during integration to verify alarms functions.
  • Performed Installation of Minilink TN (Traffic Node) for 2P, 6P,  20P and HC STM-1 which include the NPU, MMU, PFU, FAU, RAU and MW antenna both for 1+0 and 1+1 configuration to Ericsson and Motorola for Mobily-Etihad  Etisalat Project.
  • Performed configuration for PFU1, PFU2, FAU2,NPU 1 B,NPU 1 c,MMU2 C,MMU2 D,MMU2 E 155/O and LTU 155 e/o.
  • Performed Traffic routing and IP address on Minilink TN for new link.
  • Performed testing and commissioning of Minilink Traffic Node using LCT via IP for Functional Test (Configuration, Traffic routing, Loops).
  • Performed back up file using (FTP)Bulletproof server and Software Upgrade in Minilink Traffic node.
  • Coordination with MSC (Mobile Switching Center), BSC (Base Station Controller), OSS (Operation and System Support) during site integrations and troubleshooting.
  • Create the cross connection for 2G/3G sites and new transmissions link for expansions sites and upgrade.
  • Performed LOS (Line of Site Survey) and prepare Pathloss profile using Pathloss 4.0 software for new sites of Mobily-Etihad Etisalat in Riyadh.







Ericsson 3G project.


  • Supervision of installation  of NodeB (3206).
  • OIL clearing and preparing 3G site for PAT.
  • Quality inspection.
  • Sweep test of the antenna systems using Anritsu Site master for verification of VSWR and distance to fault calculation.

                                  

Worked  with  SOP (Standard  Of  Perception)  as a Telecom Engineer  in Nera Mobily  Porject.

JOB  DESCRIPTION.


  • Supervision all the Installation of  Expand and Metro Link.
  • Performed the configuration Nera  Expand and Metro Link.
  • Performed LOS (Line of Site Survey) and prepare Pathloss profile new sites of Mobily-Etihad Etisalat in KSA.
  • Labeling and  relabeling on cables(indoor and  outdoor).
  • Monitor all External Alarms and  Internal Alarms in Expand and Metro Link.
  • Oil clearing and preparing the site for PAT.
  • Supervise the IBS(Indoor Base solution)site in Akaria Mall in Riyadh for mobily.


                                                                                                               
                                                                                                HUAWEI – STC Project



 Future Communication & Guidance Int’l.   , Riyadh, Saudi Arabia

Employer: HUAWEI TECHNOLGIES  (Future Communication & Guidance Int’l.  )
Position: Transmission Engineer
Department: Implementation
Duration: MAY 2010 – 15 OCT 2010
CWO, Troubleshooting, Maintenance, site integration and Handling all types of Huawei 2G/3G installations. Configuration of Huawei 2G Microwaves on NEC & RTN software and Node B in STC Project. Alarms testing, site Pre PAT 2G/3G.and PAT, VSWR for Huawei

Job Responsibilities.

  • Check CWO and generating  E1 from the BSC to SDH Node till site as according to the CWO.
  • Troubleshooting if any during clearance of CWO in the BSC co.ordinate with STC Representative and following his instructions.
  • Clear the Transmission on all equipments specially Huawei NEC,RTN900 and make E1 status normal till the site and make visible sites in the G. Tech , GNCC.
  • Troubleshooting on the sites for make it visible to the G.TECH, GNCC and testing E1 by giving looping back to BSC.              
  • Site Integration & troubleshooting make the site ON-AIR and check all the BTS alarms from BATB and DDF physically and from the Software with BTS 3012 Huawei and also check the MW external alarms physically and software in RTN900 and make all these alarms visible to the GNCC.
  • Responsible for all types of installation for Huawei Equipments both BTS & MW on STC Project.
  • Supervise the GSM Installation (checking installing the connectors for all type of feeders ,jumpers ,cables groundings, weatherproofing on top and bottom ,check the GSM Antenna Electrical & Mechanical Tilt according to design, GSM antenna jumper connectors weather proofing, labeling for feeders on the top & bottom according to Huawei Standards, roxetic installing with silicon, inside shelter jumpers connectors on BTS covered with shrink)
  • Supervise the MW Installation (checking installation of Mw standard with all nuts & bolts, Polarization of MW accordingly as on  TD, Degree of Mw as define on TD, ODU installation, supervise the installing of IF connectors, weather proofing on IF connectors, installation of IDU, labeling on top and bottom, installation  E1, Mw alarms cables.  )
  • Preparing the sites according to the Quality Standards.
  • Commissioning& Configuration for the both Huawei NEC & RTN900 on STC Projects
  • Configure the Cross Connection by software in RTN900.
  • Check the sites with Site Master and clear the VSWR Alarms for both 2G& 3G sites.
  • Preparing the sites for PAT and conduct the PAT.
  • Survey the sites for new installation, for Swap projects.
  • Daily Maintenance of Huawei Equipments BTS3012,NODE B 3812E,NODEB 3900 and prepare Preventive Maintenance Routine (PMR) of Equipment Test List(ETL).
  • Responsible for all the TT's from NOC. For East Region.
  • Ensure the optimum overall performance of communication network and other relevant elements and sourse in Area by mean of Opereation and maintenance of exchange / switches and systems.
  • Commissioning and pre-commissioning of Huawei Equipments for  RTN900.
  • Analysis & Trouble shooting of switch hardware problems.
  • Perform continuous operation and maintenance at all level for switchs / exchanges.
  • Responsible for giving customer technical support for the enhancing the network for wireless to other part of the Region .


FTTC , ( Faisal Othman Telecommunication  )                           STC Project


Duration: May 2012 – Present

 Working with FTTC as Fallowing duties:                                                     
     
  • Project Coordinator (Eastern Region ).
  • TMR Implementation Engineer.

Training  Attended:   


·         RBS 2206 Commissioning  and  Installation.
·         TRS-2(Installation Verification RBS 2000).
·         IRC-3000(Installation Radio Cabinet RBS 3000).
·         RBS 3000 Installation Overview.


Personal Particular.
n  Place of Birth: Kingdom Of Saudi Arab
n  Contact No: +966 54 6271 483 (Saudi Arabia)
n  E-Mail: ericssonmohammad@gmail.com
n  Nationality: Pakistani
n  Gender: Male
n  Marital Status: Single
n  Spoken language: English, Arabic, Urdu ( Fluently Write & Reading )

References
References and all other relevant documents submitted upon request